Forthcoming Roadworks in Brentford


Traffic delays likely in the local area

A4 Great West Road, Brentford

21 September — 26 September Road closure

Delays likely due to Streetworks
00:.01 To 05;00 Full Closure Of The A4 West Bound Only Between Chiswick Roundabout & Ealing Rd To Carry Out Structural Repairs To M4 Elevated . Access To And From Capital Interchange Way, Lionel Rd South And Clayponds Lane On To The A4 West Bound Will Be Restricted at A4

Responsibility: Highways England

EToN status: Planned work about to start

A4 Great West Road, Brentford

25 September — 29 September Traffic control (give & take)

Delays likely due to Streetworks
S81 Cover Replacement - Works Intended To Include First Time Permanent Within Same Phase at A4

Responsibility: Thames Water

EToN status: Planned work about to start

B455 South Ealing Road

26 September — 26 September Traffic control (two-way signals)

Delays likely due to Streetworks
Sewer Cover Replacement In Carriageway at B455

Responsibility: Thames Water

EToN status: Planned work about to start

B455 South Ealing Road

26 September — 27 September Contra-flow

Delays likely due to Streetworks
Repair To A Damaged Main In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at B455

Responsibility: Thames Water

EToN status: Planned work about to start

M4

25 September — 26 September Road closure

Delays likely due to Streetworks
2200 - 0530 Hrs, Exit Slip Westbound Carriageway Closure, For Structure Works. Diversion Route: Follow M4 Towards Junction 3 And Follow A316 Parkway On The A4 Great West Road at M4, Junction 2 Exit Slip.

Responsibility: Highways England

EToN status: Planned work about to start

A4/A3005 Great West Road, Brentford

07 March — 30 November

Delays likely Lane closure

Works location: A4/A3005

Works description: Strengthening Works At Piers 19,20& 30 And 38-103 On The A4 Great West Rd With Night Time Lane Closures Between Chiswick ( Larch Drive & Boston Manor Rd During The Hours Of 10.30pm To 05.00am Mondays-Sundays Inclusive. Lane Closures Will Be A Lane 1 & 2 Closure With Lane 3 Running Or A Lane 2 & 3 Closure With Lane 1 Running Both East And West Bound On The A4 . See Package 3 Works Location Drawing Attached : Drawing 5103542/Dr/St/Wp3/001 Coordinated With Hammersmith Flyover

Responsibility for works: Highways Agency

Current status: Planned work about to start

 

September 25, 2015