Forthcoming Roadworks in Brentford


Traffic delays likely in the local area due to lane and road closures

Traffic Delays Likely in Chiswick

A315,A205 Kew Bridge Road, Brentford
13 January — 07 February
Delays likely - Lane closure
Works description : Cycleway 9 - kerb realignment. TM drawings CS9-TM-0021-3, CS9-TM-0022-2. Collaborative working with section 50 licence YG104L-MAIN-00008587/UL2 (Argon Utilities)
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference:  YG65200000149

A315,A205 Kew Bridge Road, Brentford
03 February — 10 February
Delays likely - Traffic control (multi-way signals)
Works description : Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Build 1 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Build 2 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Build 4 concrete chamber 915mm x 445mm x 965mm deep in Footway,Demolish 6 existing jointbox(s) or cabinet base(s),Install 15m of 2 poly ducts in Carriageway,Install 30m of 2 poly ducts in Footway Responsibility for works: Openreach
Current status: Planned work about to start
Works reference:  BC006TI001LC500289765106

A315,A205 Kew Bridge Road
07 February — 10 February
Delays likely - Lane closure
Works description : ****SECTION 50*** ) Excavate connection hole & trench. Lay approx. 20m of 180mm PE pipe, connect & commission entire length of installed pipe. {approx. 160m) Phase 1 & 2 NCT02a- Working hours 07:00-19:00- tm 24/7 - lane closure - ph1 NCT02b - Agreed (extended) hours 0700-19:00 NCT05a - Works restricted to area agreed in TM plan W19-1469 NCT06a - A minimum width 3.25m shall be maintained for vehicles at all times NCT11b - letter drops required Site Contact: Craig Longley 07943 083 685
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG104L-MAIN-00008587/UL4

B4491,A4000 Gunnersbury Lane, Acton
08 February — 08 February
Delays likely - Traffic control (two-way signals)
Works description : SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU600CHB1788-5

Green Dragon Lane, Brentford
08 February — 09 February
Delays likely - Road closure
Works description : CS9 - entry treatment / carriageway table TM Ref CS9-TM-0020-1
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference:  YG65200000106

A205 Chiswick High Road (north Circular Road), Chiswick
27 January — 07 February
Delays likely - Lane closure
Works description: WBS SC.2769.249.001 Install new vehicle crossover to development Footway only.Bus lane closed for pedestrian walkway
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG429427306

A315,A205 Kew Bridge Road, Brentford
27 January — 07 February
Delays likely - Lane closure
Works description: Build 4 concrete chamber 915mm x 445mm x 965mm deep in Footway,Demolish 4 existing jointbox(s) or cabinet base(s),Reinstate 12.08m3 following excavation in Footway,Reinstate 17.50m2 following excavation in Footway,Reposition 25m of 1 way poly duct,Reposition 25m of up to 6 way poly ducts
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500289765100

A315,A205 Kew Bridge Road, Brentford
27 January — 07 February
Delays likely - Lane closure
Works description: CS9 - realignment of northern kerbline TM Ref CS9-TM-0018-1 / 0019-1
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG65200000105

A315,A205 Kew Bridge Road, Brentford
27 January — 07 February
Delays likely - Traffic control (multi-way signals)
Works description: Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Build 1 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Build 2 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Build 4 concrete chamber 915mm x 445mm x 965mm deep in Footway,Demolish 6 existing jointbox(s) or cabinet base(s),Install 15m of 2 poly ducts in Carriageway,Install 30m of 2 poly ducts in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500289765103

A315,A205 Kew Bridge Road, Brentford
27 January — 07 February
Delays likely - Lane closure
Works description: FINAL CONNECTION TO NEW WATER MAIN TO BE LAID IN TO NEW DEVELOPMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU30700080184178M002

A315,A205 Kew Bridge Road, Brentford
27 January — 07 February
Delays likely - Lane closure
Works description: Build 4 concrete chamber 915mm x 445mm x 965mm deep in Footway,Demolish 4 existing jointbox(s) or cabinet base(s),Reinstate 12.08m3 following excavation in Footway,Reinstate 17.50m2 following excavation in Footway,Reposition 25m of 1 way poly duct,Reposition 25m of up to 6 way poly ducts
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500289765102

 

A315 High Street, Brentford

03 February — 07 February

Delays possible - Some carriageway incursion

Works description: DIVERSION - Cut off gas service to former Natwest Bank Building to allowdemolition

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000906901

 

A205,A315 Kew Road

03 February — 07 February

Delays unlikely - No carriageway incursion

Works description: Cycleway 9 - enabling works. resurface interior of island 4 (south east quadrant). TM CS9-TM-0028-3, working only within extent of existing TM layout, lane closures not to be implemented.

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG65200000166

 

A4001,A3002 Boston Road, Hanwell

03 February — 01 August

Delays unlikely - No carriageway incursion

Works description: Temporary Structure Licence - Hoarding

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV008TS0532

A406 Gunnersbury Avenue, Ealing

04 February — 07 February

Delays unlikely - No carriageway incursion

 

Works description: new water supply. HH Pl 1-4 4x25 4 port MDPE mtrd Supply. works in inFootway. Our intention is to complete the Permanent Reinstatement in thesame phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000809542660045-001

Ascott Avenue, Ealing

03 February — 31 July

Delays unlikely - No carriageway incursion

Works description: Temporary Structure Licence - Hoarding

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV008TS0539

 

 

 

Darwin Road, Ealing, Ealing
03 February — 11 February
Delays unlikely - Some carriageway incursion
Works description: IMGC200296 - Lay 5x (3m x 32mm) new Services from main nearside footway
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000904817

Deans Road, Hanwell, Ealing
03 February — 07 February
Delays unlikely - Some carriageway incursion
Works description: Serv Pipe Relay Inc Fitting Sz P Cway and Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031372438-001

 

 

 

 

 

 

 

February 7, 2020