Forthcoming Roadworks in Brentford


Traffic delays likely in the local area due to lane and road closures

A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
15 March — 28 March
Delays likely Lane closure
Works location: Unknown
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 1. TM 24/7
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400401676
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
15 March — 29 March
Delays likely Lane closure
Works location: Unknown
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM 24/7
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400402049
B363 St Johns Road, Isleworth, Hounslow
15 March — 17 March
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Excavate and install approx 6m new gas pipe. Comprising of approx 1m c/way and 5m f/way. E: 515764 N: 176078
Responsibility for works: Fulcrum Pipelines Limited
Current status: Planned work about to start
Works reference: WY001NSA00022358
M4
14 March — 15 March
Delays likely Road closure
Works location: Slip Closure Westbound.
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 76259
M4
15 March — 16 March
Delays likely Road closure
Works location: Slip Closure Westbound.
Works description: M4 Jct 2 Westbound exit slip road closure for pier monitoring works. Diversion via Highways England Network.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 76259
Bollo Lane, Acton, Ealing
14 March — 20 March
Delays possible Some carriageway incursion
Works location: Unknown
Works description: 1 x HX joint hole on the jnc of Bollo Lane and Enfield Rd. 1 x LV joint hole on Bollo lane, O/S site entrance. 10m of footway in Enfield Road Acton.
Responsibility for works: GAS TRANSPORTATION CO LTD
Current status: Planned work about to start
Works reference: ZP011P-0094715/R4
M4
14 March — 15 March
Delays possible Lane closure
Works location: Hardshoulder and Lane 1 Closure Westbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: M4 Jct 1 to Jct 2. Lane Closures Westbound for pier monitoring works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 76182
M4
15 March — 16 March
Delays possible Lane closure
Works location: Hardshoulder and Lane 1 Closure Westbound. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: M4 Jct 1 to Jct 2. Lane Closures Westbound for pier monitoring works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 76182
A310 Twickenham Road, Isleworth, Hounslow
15 March — 19 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Excavate to clear blockage in footway
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMBU/100275253
A4001,A3002 Boston Road, Hanwell, Ealing
14 March — 13 May
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Temporary Structure Licence - Scaffolding
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV008TS0416
A406 Gunnersbury Avenue, Ealing, Ealing
14 March — 17 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: DISCONNECT 1 X 32MM PE GAS SERVICE FROM MAIN IN THE VERGE
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000817481
A406 Gunnersbury Avenue, Ealing, Ealing
14 March — 20 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: DISCONNECT 1 X 32MM PE GAS SERVICE FROM MAIN IN THE VERGE
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000813079
B454 Syon Lane, Isleworth, Hounslow
15 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: PERM REINSTATEMENT IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-195853
B455 Ealing Road, Brentford, Hounslow
14 March — 15 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CLEAR 3.5M BLOCAKGE IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMFI/100274448
B455 South Ealing Road, Ealing, Ealing
16 March — 16 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF FOUND. FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14650510J03
Boddington Gardens, Acton, Ealing
15 March — 19 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141GVSM--000001
Bollo Lane, Acton, Ealing
15 March — 19 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: REPLACE LIGHTING COLUMN
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV806S000000000905
Bramley Road, Ealing, Ealing
15 March — 19 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141HFDX--000001
Brook Lane North, Brentford, Hounslow
16 March — 19 March
Delays unlikely Traffic control (give & take)
Works location: Unknown
Works description: INTERIM TO PERM
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMFI/100268164
Burlington Road, Chiswick, London, Hounslow
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141GQKZ--000001
Commerce Road, Brentford, Hounslow
14 March — 15 March
Delays unlikely Traffic control (priority working)
Works location: Unknown
Works description: Remedial works to correct defect, 30m of hra needs to be dug out, as it is too shallow
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500260804501
Elers Road, West Ealing, Ealing
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Water meter installation in footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-212217
Elers Road, West Ealing, Ealing
16 March — 16 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14634007J3
Hornbeam Crescent, Brentford, Hounslow
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141GWWV--000001
Leighton Road, West Ealing, Ealing
15 March — 19 March
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Ferrule Exchange Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031191261-001
Loring Road, Isleworth, Hounslow
15 March — 19 March
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: B Box Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031254725-001
Loveday Road, West Ealing, Ealing
14 March — 18 March
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Serv Pipe Relay Ex Fitting Sz P f/way and in Carriageway. Our intentionis to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031253555-001
Mervyn Road, West Ealing, Ealing
16 March — 16 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14661687J3
Overton Close, Isleworth, Hounslow
15 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: PERM REINSTATEMENT IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-203554
Rothschild Road, Chiswick, Ealing
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: REPAIR LEAK IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141GXSH--000001
Somerset Road, West Ealing, Ealing
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Install 11m of 1 way poly duct in Footway,Install 1m of 1 way poly duct in Verge,Provide 1 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500277079600
Weston Road, Chiswick, Ealing
14 March — 15 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: WATER METER INSTALLATION IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-212740
Wood Lane, Isleworth, Hounslow
14 March — 18 March
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141HFXM--000001

 