Forthcoming Roadworks in Brentford


Traffic delays likely in the local area due to lane and road closures

A315 High Street, Brentford, Hounslow
02 September — 03 September
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141CVJH--000002
A315 High Street, Brentford, Hounslow
02 September — 04 September
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141CVZV--000002
M4
03 September — 04 September
Delays likely Road closure
Works location: Slip Closure Eastbound.
Works description: M4 Jct 2 Eastbound Entry Slip Slip Closure Eastbound for resurfacing works Diversion via Local Authority Network
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 62983
Spring Grove, Chiswick, London, Hounslow
03 September — 08 September
Delays likely Road closure
Works location: Unknown
Works description: new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000806822390045-001
A3000 Wellesley Road, Chiswick, London, Hounslow
03 September — 06 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031146290-001
A3000 Wellesley Road, Chiswick, London, Hounslow
03 September — 06 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: B Box Install <33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031146002-001
Eastbourne Road, Brentford, Hounslow
03 September — 06 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Fire Hydrant Standard Repair in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031146042-001
Junction Road, Ealing, Ealing
03 September — 05 September
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/13996737J9
Princes Road, Kew, Richmond upon Thames
03 September — 06 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: OUTSIDE STOP VALVE INSTALLATION IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU275OSV-198396
Stile Hall Gardens, Chiswick, London, Hounslow
03 September — 06 September
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031146283-001

 