Forthcoming Roadworks in Brentford


Traffic delays likely in the local area due to lane and road closures

A4,A3002 Boston Manor Road, Brentford, Hounslow

04 October — 04 October

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: Anti Skid - EUROVIA - Matt Gurney

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00855000151

Marlborough Road, Chiswick, London, Hounslow

06 October — 06 October

Delays likely - Road closure

Works location: Unknown

Works description: Crane operation - Riglift UK Ltd - Activity permit AP1432

Responsibility for works: Hounslow

Current status: Advanced planning

Works reference: FQ99734035700

A4020 Broadway, West Ealing, Ealing

04 October — 07 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: Install 7m of 2 poly ducts in Footway

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500286362701

A4 Great West Road, Brentford, Hounslow

04 October — 06 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: INSTALL 34M IN FOOTWAY

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SSEMND/100309301

B452 Northfield Avenue, West Ealing, Ealing

04 October — 15 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: Build 1 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 12m of 4 poly ducts in Footway,Install 2m of 7 poly ducts in Footway,Provide 1 core drill(s) into jointbox or building

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500286587200

Cairn Avenue, Ealing, Ealing

04 October — 08 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: WATER METER REPLACEMENT/INSTALLATION IN FOOTWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU039NOT-227276

Dorset Road, Ealing, Ealing

04 October — 01 November

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: connection onto the 14. CI LP Main. This is part of our major worksonSouth Ealing Road.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000874385

Ivy Crescent, Chiswick, Ealing

04 October — 05 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF FOUND. FOOTWAY WORKS ONLY

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SSERRE/15310455J10

St Marys Grove, Chiswick, London, Hounslow

06 October — 09 October

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU356002141JTTD--000002

The Park, Ealing, Ealing

04 October — 08 October

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: OUTSIDE STOP VALVE REPLACEMENT/INSTALLATION IN FOOTWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU275OSV-226111

October 4, 2019