Forthcoming Roadworks in Brentford


Traffic delays likely in the local area due to lane and road closures

Forthcoming Roadworks in Brentford

Ealing Park Gardens
04 August — 11 August
Severe delays likely - Road closure
Works location: Ealing Park Gardens from Windmill Road to o/s No3 Ealing Park Gardens
Works description : Microsurfacing works, dates and duration to change following PAA
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference:  DV00665000894

Baronsmede
05 August — 12 August
Severe delays likely - Road closure
Works location: Baronsmede from Popes Lane to Gunnersbury Lane
Works description : Resurfacing works, dates and duration to change following PAA
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference:  DV00665000946

Wood Lane, Isleworth
10 August — 12 August
Severe delays likely - Road closure
Works location: Wood Lane level crossing
Works description : LIFT & CHANGE RAILS ON THE DOWN ROAD AT LEVEL CROSSING
Responsibility for works: Network Rail
Current status: Planned work about to start
Works reference:  KL156HOU-11-70-100820

Lionel Road South, Brentford
10 August — 12 August
Delays likely - Lane closure
Works location: 70m from the Stop Line of the junction with Great West Road
Works description : 25/039 tel0255425 - slot cut c/w sensor loops to repair traffic signals SD4 plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, northbound c/w swapping lane 1 & 2and f/w to chamber (ped access maintained)
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference:  YG516S000000006257

St Marys Crescent
11 August — 13 August
Severe delays likely - Road closure
Works location: THORNBURY RD TO RIDGEWAY RD N
Works description : Pothole pledge
Responsibility for works: Hounslow
Current status: Planned work about to start
Works reference:  FQ00888823125

Boston Manor Road
13 August — 17 August
Delays possible - Some carriageway incursion
Works location: OPP 155
Works description : OSV Locate <33mm Fway in Footway. Our intention is to complete
the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU301000031493917-001

Balfour Road
10 August — 12 August
Delays possible - Some carriageway incursion
Works location: 13 BALFOUR ROAD, LONDON, W13 9TN
Works description : B Box Repair in Footway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference:  MU301000031493280-001

A315 High Street, Brentford
27 Jul - 21 Aug
Delays likely - Traffic lights,
Works description : TRAFFIC LIGHTS ASSOCIATED WITH WORKS ON LONDON ROAD
Responsibility for works: Thames Water
Current status: Advanced planning
Works reference:  MU031J415-CROSSCON-002

B455 South Ealing Road, Ealing
18 May — 06 September
Delays possible - Some carriageway incursion
Works description : IMGA202378 - MAINS REPLACEMENT WORKS. REPLACING APPROX 1109M X CI ANDREPLACING WITH 630MM PE BY MEANS OF INSERTION. THIS WILL ALSO INCLUDE REPLACEMENT AND TRANSFER OF SERVICES
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference:  AZ0071000917934

A205,A315 Kew Road
14 Feb — 2 October
Delays likely - Lane closure
Works description : Cycle Superhighway 9 - initial notice for section 58 purposes and to cover works before/after construction is complete and prior to full opening while other phases are being completed.
Responsibility for works: Transport for London
Current status: Work in progress
Works reference:  YG65200000074