Roadworks in the Ealing Area
Traffic delays likely as a result of road and lane closures
A40/A406 Western Avenue, Ealing, Ealing |
28 January — 30 January Road closure |
Delays likely due to Streetworks
Cyclical Routine Maintenance Full Closure Under S6 Tro Wb Bore Closure 28.01 Eb Bore Closure 29.01 at A40/A406 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
A4127 Greenford Road, Greenford, Ealing |
28 January — 01 February Traffic control (two-way signals) |
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A4127 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
Broadway, Hanwell, Ealing |
27 January — 29 January Lane closure |
Delays likely due to Streetworks
- at - |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
27th January 2015
|