Closures and diversions which may cause problems
Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
28 March — 04 April |
||
Delays likely Traffic control (multi-way signals) |
||
Works description: excavation works - telecoms mast maintenance - hiab in carriageway, pedestrian walkway to be installed in carriageway, three way traffic lights to be used |
||
Responsibility for works: O2 (UK) Limited |
||
Current status: Planned work about to start |
||
Works reference: MG08043832/CLS/SJTM |
|
|
||||||||||
|
||||||||||
|
||||||||||
|
|
15 March — 29 March |
||
Delays likely Lane closure |
||
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM 24/7 |
||
Responsibility for works: Transport for London |
||
Current status: Planned work about to start |
||
Works reference: YG400402049 |
|
||||||||||
|
April 2, 2019