Forum Topic

More outrageous is that no moratorium has taken place to suspend all multi storey developments until complete and thorough methods of design, build and safety has been fully investigated and reviewed.The fiasco of Building control and contracting out direct with the client. Pedantic stances on insignificant issues and blind eyes or sheer ignorance on major issues and very little expertise.Following interpretations of rule and regulations from a text rather than a full understanding of construction and materials in a practical context.It's a poorly recognised high skill and very neglected.  Keeping the Fire Service shut out at planning and design stages and silencing grass roots Fire Officers and even the most senior ones when they dare to speak out is still happening.  On all sorts of safety issues too often.They need to be freed of their political shackles and masters. and need to be heard from a pragmatic point. The HSE are far too selective about where they intervene and not very accessible to ordinary members of the public.  They ignored the asbestos and lack of dust containment complaints during the demolition of the Alfa-Laval -Baltic Centre, built with asbestos content concrete.  Carried out in a windy month, that dust went all over Brentford.  Nothing was actioned or even properly investigated.  Containment ran to just one hose behind the houses in Layton rd.Maybe a new body combining Building Control, the HSE and Fire services, with teeth and fully independent of external involvement from developers and politics alike should be created and have a full input on aspects of design build and materials and safety first.

Raymond Havelock ● 1692d