Forum Topic

Gridlock

Is now happening. Yesterday evening at about 6pm there were at least 20 cars queuing along Whitestile Road and back up Junction Road in an attempt to get out onto South Ealing Road. This meant that anyone who had turned left into Whitestile Road from South Ealing Road was unable to drive along Whitestile Road - it was blocked by the oncoming traffic.  Traffic was queuing up South Ealing Road as far as the eye could see and barely moving.Not the first time this has happened recently.I am guessing that this was traffic trying to bypass the roadworks and traffic lights on Windmill Road or people trying to bypass the queue down the A4 to the new traffic lights at the roundabout at the Ealing Road/A4 junction.The Windmill Road works seem to be never-ending and are causing huge tail-backs.  If you are driving north from Brentford and want to get across the A4 junction you have to sit through several green phases before there is enough room in Windmill Road to clear the junction safely and not get stuck in the yellow box. The same thing is happening to traffic turning left into Windmill from the A4.The new traffic lights at the Ealing Road/A4 roundabout are causing lengthy tailbacks along the A4.  They are also affecting traffic turning left onto the A4 from Windmill Road because even if the lights at the Windmill Road junction are green there is not enough room on the A4 to make the turn.  This then also holds up traffic coming down Windmill Road which wants to go straight ahead or turn right.As others have said, the old traffic lights at the South Ealing roundabout worked perfectly well. I've been driving round that roundabout for the last 20 years (don't take that literally!) and never encountered or witnessed any problems.  You just had to make sure you gave way to traffic already coming round the roundabout, even if lights were green in your favour.  At least the traffic kept moving.The other problem locally is the roadworks on Kew Bridge Road which are causing tailbacks to the County Court. There has been some suggestion that these are not due to the construction of the Cycleway but because of gasworks being carried out at the same time.So, 3 points/queries:1. When are the Windmill Road works going to end?2. Please can we return to the old traffic light system at the Ealing Road roundabout.3. When are the Kew Bridge Road temporary lights going to be removed so that we can have a normal traffic flow once again?The gridlock which is now a daily occurrence around here at the moment does nobody any good - whether you're a driver, cyclist or pedestrian.  I was walking down Whitestile Road yesterday evening and it was horrible.  So was South Ealing Road.

Alison Robins ● 317d8 Comments