Thames Water works affecting Windmill Rd then Ealing Rd
Thames Water’s Victorian water mains replacement programme continues:30 March to 15 May 2009Replacement of water mains in Windmill Road from its junction with A4 Great West Road to the junction with Murray Road. During this time Windmill Road will be made one-way northbound. Traffic will be able to enter Windmill Road from the A4 but all southbound traffic will be diverted via Little Ealing Lane, South Ealing Road and Ealing Road and A4. Any traffic exiting from the side roads into Windmill Road will have to turn north and follow the diversion. Minor changes will be made to the traffic signal timings to cater for the additional traffic that will be using Ealing Road. Waiting and loading restrictions will also be introduced alongside the works area to ensure the northbound traffic can flow unhindered.1 June to 17 July 2009Replacement of water mains in Ealing Road from its junction with A4 Great West Road to the junction with Occupation Lane. During this time Ealing Road will be made one-way northbound. Traffic will be able to enter Ealing Road from the A4 but all southbound traffic will be diverted via South Ealing Road, Little Ealing Lane, Windmill Road and A4. Any traffic exiting from the side roads into Ealing Road will have to turn north and follow the diversion. Changes will be made to the traffic signals timings on the A4 to cater for the additional traffic that will be using Windmill Road, and a new right-turn phase will be introduced at the Popes Lane / South Ealing Road junction to make it easier for traffic to turn from South Ealing Road into Little Ealing Lane. Waiting and loading restrictions will be introduced alongside the works area to ensure the northbound traffic can flow unhindered. Also, some restrictions will be required on Windmill Road to ensure that the diversion route is clear of any obstructive parking.Some delays are expected to occur on the diversion routes, but with a combination of widespread advance warning signs and changes to the signal timings it is hoped that these will be kept to a minimum.________________________________________________ Chris Calvi-FreemanHead of TransportLondon Borough of Hounslow
Chris Calvi-Freeman ● 6268d7 Comments