Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead  
              
      
        
          
              
                | A3218 Lillie Road, London, Hammersmith And Fulham  | 
               
              
                | 11 July — 17 July Traffic control (multi-way signals)  | 
               
              
                Delays likely due to Streetworks 
            Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at A3218  | 
               
              
                | Responsibility: UK Power Networks  | 
               
              
                | EToN status: Planned work about to start  | 
               
            | 
         
        
           | 
         
        
           | 
         
        
           | 
         
        
          
              
                | A402 Goldhawk Road, London, Hammersmith And Fulham  | 
               
              
                | 10 July — 14 July Some carriageway incursion  | 
               
              
                Delays possible due to Streetworks 
            Boundary Box Remove In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A402  | 
               
              
                | Responsibility: Thames Water  | 
               
              
                | EToN status: Planned work about to start  | 
               
            | 
         
        
           | 
         
        
           | 
         
       
        
        
      Information supplied by Roadworks.org 
        
       
       
      
           |