Upcoming Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A219 Fulham Palace Road
30 August — 03 September 
Delays likely Lane closure 
Works description: LAY A 32mm DUAL SERVICE TO METER POSITIONS ON THE 1st AND2ndFLOORSOFPROPERTY, CONNECTION TO EXISTING MAIN IN CARRIAGEWAY NEARSIDE. 
Responsibility for works: Cadent 

B408 Paddenswick Road
20 August — 01 October 
Delays likely Traffic control (multi-way signals) 
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY
Responsibility for works: THAMES WATER 

Lena Gardens 
30 August — 04 September 
Delays possible Some carriageway incursion 
nWorks description: Electrical works to be carried out in a chamber in c/w following FLIP Installation 
Responsibility for works: THAMES WATER

 

Information supplied by roadworks.org

Related links
Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith