Where to expect traffic delays in the days ahead
Du Cane Road
      30 October 
      Delays likely Traffic control (two-way signals) 
      Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE 
      Responsibility for works: THAMES WATER 
Westway 
      31 October — 1 November 
      Delays likely Lane closure 
      Works description: 27/001 TEL0201619 - Access TfL traffic signal pole 24 mast arm, complete a bulk lamp change. 23:00-05:00. W/B lanes 2 and 3. Short stay works, approx 15 mins on site. No noisy works involved
      Responsibility for works: Transport for London 
Cobbold Road
      30 October — 30 October 
      Delays possible Some carriageway incursion 
      Works description: Thames Water need to carry out works on the water valve. Two way traffic to be maintained for vehicles at all times. Minor Works, No Excavation.
      Responsibility for works: THAMES WATER 
Masbro' Road 
      30 October — 1 November 
      Delays possible Some carriageway incursion      
      Works description: H Kerb/channel block alignmentResponsibility for works:Hammersmith and Fulham 
Information supplied by roadworks.org
October 29, 2018
  |