Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead  
            
      
      
      
        
          
              
                | A4020 Uxbridge Road, London, Hammersmith and Fulham | 
               
              
                | 18 February — 01 April | 
               
              
                | Delays likely Traffic control (two-way signals) | 
               
              
                | Works location: Unknown | 
               
              
                | Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN | 
               
              
                | Responsibility for works: Cadent | 
               
              
                | Current status: Planned work about to start | 
               
              
                | Works reference: AZ0071000802012 | 
               
            | 
         
        
           | 
         
        
          
              
                | A402 Goldhawk Road, London, Hammersmith and Fulham | 
               
              
                | 20 February — 20 February | 
               
              
                | Delays likely Lane closure | 
               
              
                | Works location: Unknown | 
               
              
                | Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. | 
               
              
                | Responsibility for works: THAMES WATER | 
               
              
                | Current status: Planned work about to start | 
               
              
                | Works reference: MU600CHB3003-4 | 
               
            | 
         
             
      
        
          | B408 Askew Road, London, Hammersmith and Fulham | 
         
        
          | 18 February — 18 February | 
         
        
          | Delays likely Contra-flow | 
         
        
          | Works location: Unknown | 
         
        
          | Works description: Minor, non excavation works. Contraflow system to be installed with all chapter 8 signage, cones and barriers. Cherry picker to access telecoms antenna for testing / maintenance works. | 
         
        
          | Responsibility for works: Vodafone | 
         
        
          | Current status: Planned work about to start | 
         
        
          | Works reference: NX11578978/ERI/STM/KS | 
         
               
        
      
        
          |   | 
         
        
           | 
         
        
          
              
                | A219 Wood Lane, London, Hammersmith and Fulham | 
               
              
                | 15 February — 15 March | 
               
              
                | Delays likely Traffic control (two-way signals) | 
               
              
                | Works location: Unknown | 
               
              
                | Works description: NEW WASTE WATER AND SEWER CONNECTION, WORKS IN THE FOOTWAY AND CARRIAGEWAY | 
               
              
                | Responsibility for works: THAMES WATER | 
               
              
                | Current status: Advanced planning | 
               
              
                | Works reference: MU30700050103887-W001 | 
               
            | 
         
             
      
        
          | Bentworth Road, London, Hammersmith and Fulham | 
         
        
          | 15 February — 19 February | 
         
        
          | Delays possible Some carriageway incursion | 
         
        
          | Works location: Unknown | 
         
        
          | Works description: B Box Install <33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase | 
         
        
          | Responsibility for works: THAMES WATER | 
         
        
          | Current status: Planned work about to start | 
         
        
          | Works reference: MU301000031236451-001 | 
         
               
        
        
        
        
        
      
      Information supplied by roadworks.org  
        
        
        
              
        
        
        
        
        
        
  February 18, 2019
 
 
 |