Forum Topics

Calling All Volunteers! The Orangery, Gunnersbury Park this Saturday 12noon-4pm

ORANGE ROCKCORPS: Gunnersbury Park Project Saturday 25th June 2011, 12 noon – 4pmGunnersbury Park, The Orangery, W5 4NECalling All Volunteers!Gunnersbury Park is a beautiful 75 hectare (186 acres) landscape of exceptional mature trees, open grass spaces and historic buildingsregistered as Grade 2* by English Heritage with 21 separately listed buildings.Orange and RockCorps have come together to help you to give something back to the community. Take part in Orange RockCorps and help transform the Orangery in Gunnersbury Park. Big old buildings don't come better than this!If you are free on Saturday 25th June 2011 between 12 noon - 4pm and would like to help the Orange RockCorps team to renovate the Orangery by painting, washing, scrubbing, varnishing and just generally having a jolly good old time, then all you need to do is register as a volunteer online at:  http://www.orangerockcorps.co.uk/ or call 0800 954 7625. After you give your 4 hours, you'll get given 1 ticket to see some great musical artists.RockCorps is a pro-social production company. RockCorps uses music to inspire people to volunteer and get involved in their community. To date, over 45,000 volunteers have attended more than 20 amazing live music events. This is an opportunity not to be missed out on!!  This park exudes history, beauty and culture and this project will see the transformation of a currently disused building into a beautiful space. We guarantee you won't be disappointed. So come down and join the Orange RockCorps team as we take a step back in time! Note:• Registering online is essential: Only confirmed volunteers get all the details and a reserved place on the project.• You must be at least 16 years of age to participate in an Orange RockCorps project.

Rishi Joshi ● 5615d0 Comments ● 5615d

BAA/Everest replacement window scheme

I posted this the other day.BAA Everest window scheme is fast proving a disaster for us.A huge number of the windows are scratched.  The french door is still in the back garden as one of the two doors was missing a fortnight ago and hasn't been tracked down yet.  Taking advantage of the time it has lain in the garden meant we could check it over and the hinges are scratched.One window installed upstairs is meant for downstairs and the one downstairs is not meant to be so they have re ordered.The 'machine cut' window sill for the downstairs bay was the wrong size so a piece of wood arrived on site without the tools to cut it to size - so it split and now has to be re ordered and I haven't a clue how they will get the other one out without damaging the frame ...   ?The man had to work without scaffolding taking huge pieces of glass backwards down a ladder (lots of questions from us about this I can tell you).  The one piece of scaffolding that was ordered,over the porch, didn't have an access point so they had to climb over the top of the bars and it was installed 'under' the window ledges to our porch which has bent the UPVC sills and split the sealant.Everest was supposed to be back this week to confirm a list of the work and didn't turn up so after phone calls they are supposed to be here on Monday - I suppose that means nothing has been reordered?  Hubby suggested that they might like to forget the visit and just re order the lot.

Sarah Felstead ● 5840d45 Comments ● 5618d