Forum Topics

Closing off Albany road

As usual no mention of this when proposing the extension of the school to a second site which is a good idea.But as usual, done on the cheap and will lead to constant and costly upheaval every time children need to move sites.A simple solution would be a subway linking the sites as it is a relatively short distance.The problem closing the road is it does not achieve much.For cyclists it is not a logical route as Grosvenor road and the park to the half acre has already  been opened up as a cycle route avoiding buses and most other traffic. But Lateward road is the more logical west -east route - apart from the potholes.But this will force almost all local traffic into Lateward road . It will also cut Morrisons off from all shopping traffic from the east side of the area, adding to the congestion at Half Acre and small roads like Wilkes road and Albany road itself will also be subject to blockages and increased diversionary traffic.It will also lead to Lateward road being blocked by the 50% increase in school run drop offs and collections which currently affect three roads so water down the problem.This will concentrate the problem to one road which potentially traps a whole neighbourhood.The same applies to the severe reduction is access to the whole area for emergency vehicles.Cyclists wont and don't use the road up the side of the court as it is mainly used by buses and Morrisons traffic and HGVs and is a short steep incline.  It will also be hazardous for cyclists then turning right across channelled traffic and then into a blind corner occupied possibly by school children.Would be better to make Albany Road  one way for the last 50m and leave the cycling route as it is.But a footbridge or a tunnel keeping the children away from all traffic and keeping them within the secure confines of school premises would be a far better solution long term.

Raymond Havelock ● 4182d5 Comments ● 4176d